lol so it looks like they had the power cut in their dc. Hence the mining stopping.
https://groups.google.com/a/gawminers.com/forum/#!topic/finance/O1ByNN_pZiY
It has come to my attention that the power bill for the Hydra data center has not been paid for the months of November or December. This is a significant amount and the delay in payment is causing Mississippi Power to have some concern. Joe and I were able to negotiate the deposit down from $150,000.00 to $50,000.00 but our failure to pay the bill in a timely manner could cause that deposit to go up. I was told this morning that a disconnect is scheduled for Jan 16 if the bill is not paid. Please let me know something by the end of the day so I can relay the message to Jeff Beaty at Mississippi Power.
Thanks,