I don't need to do math to see that one fan in the air is not near enough.   An asic data center getting exhust out is important.  

Unless they changed their design and added a lot of extra gear that picture shows something not setup for a large quanity of gear.  If they kept adding gear it's not surprising they would need a retrofit.

Unless there is a lot of gear behind where person is standing that we cannot see for ventilation.

I'm sorry you may not be fully reading the thread at hand. The picture you see is my facility and has nothing to do with ASICSPACE. Of course what you see is inadequate for any kind of ventilation we haven't even begun to modify it for our purposes. We will be pulling 16 strands of 500kcmil aluminum XHHW wire from the 1000KVA transformer outside the building to the service entrance inside tomorrow. Spent the past two weeks cutting concrete, digging ditches, placing conduit, inspection, refill the ditch. I ordered 1000ft of 6awg tray cable to feed the 48 60A/3P IBM PDU's on friday. I have my PCI-E cable assembly line together, with an automatic wire cutter/stripper machine. Over 20K feet of 16awg wire for PCI-E cables. Those are in rooms behind me in that picture. Also have the office room back in there and just put in a fridge and microwave so now there is a mini kitchen. My HVAC crew is on standby, we just arn't there yet but getting all the closer. An unopened bottle of silver Patron is on the counter waiting for the install of miner #500.