On the other hand, if they were all full of project management structured B.S. and 7 levels of hierarchy, each one of which were professionally prepared I'd probably have to sell all my Dash just for the pleasure of not having to read them.
I never said any of that, nor would I want a system that required that level of reporting. We need to find the minimum level to stop abuse and keep the network informed. I think if we have zero reporting requirements (such as where money is being spent) we'll run off a cliff.