I point to the part of "Delivery of tested working Units"
/facepalm
So you think the delivery company will fail to deliver them?
I asked
specifically at which point the failure would be expected. An ignorant "HERP DERP THEY WONT DELIVER" is not a specific point.
Possible answers from someone who isn't stupid would be "the fab won't have finished all the layers in time" or "the packaging will take longer than expected" or "chips will get stuck in customs" or "functional testing will fail" or "thermal/environmental testing will fail" etc.
NO PROTOTYPE
How do you know there was
no prototype? A prototype with major issues (eg. overheating or reliability issues) would not be something they would want to brag about or produce demos of, but they would learn what they need to produce a full run of working chips.