You have repeatedly stated that it's "impossible" to do things, yet somehow BFL is trying to do the "imposisble."
FTFY. Historically BFL has only failed in every "impossible" task they have attempted, and till this date have no results.
Why do you continually prod me with a stick? I have left you alone to go do your own thing with your ancient technology and your ridiculously immense power requirements, yet you want to keep antagonizing me. Why is that?
Sorry Inaba, but you are completely full of shit. Completely.
You've continue to refresh what I've thought was the rock bottom of your ability to construct a logical response. The delusional confidence you have from a mere simulation is laughable.
I wish you best of luck for when
if you get your chips back at the end of this month a miracle descents and BFL is able to meet your 1.2w per Gh/s fallacy
p.s.
You are not the only one with 65nm simulations.
Question:
How far does Avalon have to miss their stated performance before you request a full refund?
This is purpose of this thread and it should apply to every ASIC manufacture, Avalon included, but not limited to.
When does a delay or the failure to meet expectations cross the line into a scam?
Never, since that usually comes from bad luck or incompetence.
Really now? Maybe I should announce we'll be shipping at our
original shipping date of end of Feb, 2013 due to "bad luck"