Post
Topic
Board Hardware
Re: Local Electricty company shut me down for mining.
by
sidehack
on 08/10/2016, 04:31:26 UTC
That's why when we upgraded service at the shop I ran the lines from the transformer myself, with wires about 15% overrated for the rated service load. The transformers should blow up before anything I have to pay to replace. The utility provider has not been upset at all that I'm pulling 100KW continuous.