Post
Topic
Board Hardware
Re: Local Electricty company shut me down for mining.
by
ChineseSavior
on 25/10/2016, 22:17:50 UTC
Hello folks,

I can assure all of you that them shutting down my power is very real. I will post the emails later. Or will I what good will that do. Trolls will simply tell me I made it up. OR should I post the audiotape from chatting with the supervisor today? Or did I troll that to? And if I post those things and it hurts his feelings (which it would mine if I were him) will he get me in trouble or bother me? Think about it trolls.

In response to the positive folks I would like to say that it does seem like they simply want me to move to the commercial rate. But they only allow this in Jan when they do their application. There is a $450 fee for them to survey. Along with a $190/kw 1 time energizing charge and another small fee. The rate jumps from 2.7 to 3.4

As stated just for all the doubters that if did not shut off HDL use would be shut off today. So basically just wait until jan to submit the application and make the switch.

They also told me there are a lot of people on this transformer drawing a lot of electricity. They said its being very over drawn right now. So they are having to keep an eye out more then usual. They seem peaceful.

I work at an industrial facility.  Currently we are using 7846KW or 7,846,000W.  They call us and ask us if there is a problem when we shut the plant down for an extended period of time or if one of our two plants is running like now.  Our normal usage is like 14800KW with both plants running.  They will sell us all we can take at 2 cents a kw which is the commercial rate here.  Bill is only like $400,000 a month.

Is your underground fusion power generator very high maintenance?  Roll Eyes


Which rolls us into our next phase of the Data-center conspiracy.....

If all the YUUUUGGGGEEE Datacenters are all over the place where are they drawing their power from?

In theory there should be GIANT Carrier lines going to these facilities. Like lines as big around as a school bus. Instead what do we see? a Measly transformer outside without many carrier lines going in.

I will not say who it was but someone very very close to me was high up in the industy. Seems like they are all sworn to secrecy. When I started bombarding him with the electricity questions I began interrogating about the underground fusion centers.

Their reaction told all. (pun intended)

It's actually 3d printed on site and has over a 100 year maintenance-free life span