Need any info/help around the Solvay area feel free to ask, even without the .5 BTC it'd be interesting to glance around your server farm and see what you've got set up.
There's enough big buildings/factories in the Solvay area to figure that your MW demand shouldn't disturb anything. If you ask them of any buildings around here that are vacant but have enough wires dropped to satisfy your demands they might be able to help, off the top of my head I can't think of anything that's for sale besides some random houses/apartments that are around. Unless you buy a house and hire an electrician to drop in some more wire they won't be much help though haha.
I called the Solvay Electric Department today and was given direction about open real estate that is able to put up with those power needs, so I'm going to follow through with that. Any help you could give me would be great, it's actually looking like a promising spot due to the dirt cheap electricity and the fact that most data centers have minimum power requirements (80 KW/month!) that far exceed my current budget.
100 kilowatts? Did I read correctly? It is like electric train accelerating.
I know, it's funny. Perhaps he needs 100 kw/hr per month, not 100 kW
Not all of us are power engineers. Well, I am, but the rest of you guys are probably not.
I mean 1000 kWh/day, which translates to about 8 KW/month. I had a funny mix up on the phone about that today where this guy thought I was going to power a small city.