Post
Topic
Board Service Announcements
Re: SinoHash second facility opens for preorder
by
Eric Mu
on 22/03/2017, 15:55:42 UTC
Dear users

As you may know that we have been building a new farm - one that has stabler power supply and better temperature control- but today we experienced an issue that didn't occur during the test run and it led to the main circuit breaker to trip multiple times. Eventually we decided to switch the power off. Our electric engineer already located the source of the problem and promised to fix it tomorrow.

Apologies,
Eric