only another 13 days or a little over for the segwit signaling to hold aboce 75%
Currently above 81%.
Not sure why you state 13 days since the current activation period will end in about 1.5 days at the time of this posting. Then the sixth activation period of 8064 blocks begins. We will need it to hold above 75% for that activation period. Currently approximately 15.5 days before lock-in occurs. About 29.5 days before the first segwit block is mined.