This BIP will be active between : - midnight August 1st 2017 (epoch time 1501545600) - and midnight November 15th 2017 (epoch time 1510704000) - if the existing segwit deployment is not locked-in or activated before epoch time 1501545600.
This BIP will cease to be active when segwit is locked-in.
This BIP will be deployed by a "version bits" with an 80%(this can be adjusted if desired) activation threshold BIP9 with the name "segsignal" and using bit 4.