This is awesome Cool

Are you able to keep the rigs running 24/7 with the solarpanels alone?

You need to be grid tied or have battery backup with enough capacity to last the hours where sun is non-existent or suboptimal.
Practically speaking with grid tie you'll need about 30 panels per Antminer S9 if you are in the north. if you are closer to equator with less clouds and obstructions, you may be able to power 1-2 miners with similar configuration.