So after months on preparation ideas and fails, I'm finally operating right now with 10 S9s (120 TH/s) and 4 L3+(2000MH/s) just to let you guys know it costed me a lot of time ti find a place with with enough power capacity and then it costed me 7000$ for an electrician to do 32 outlets on that room for me. i also bought 2 portable AC/s and a few fans.