At first i missunderstood about the power cost , i thought it was 0.33 usd / kw. So that's why iam selingl 5280token
With (3) L3+ in sep. and D3 (2) first batch in sep.
But in fact its 0.033usd / kw. Lol. Too much space. Between 0.33 to 0.033. (10times)
So now iam really interesting in this project again