The timeline has been updated on their site!
Pods 3, 4, and 5 have had their foundations poured, passed a city inspection, and installed (or are currently installing) the electrical systems.
Also, it looks like they're working on the pods concurrently, about 3 at a time.
https://giga-watt.com/promo/timeline