BORZALOM 777
Question 2.What is the expected timeframe for setting up and auctioning the L1 nodes? Will that be aligned with the level 2 and 3 nodes?
After the STaTiC+PoSign test closed (where we use manual registered STaTiC-s ) then the next test will be the test of STaTiC registration. Each level ( L1,2,3) will be open. The original Level1 STaTiC-s was added to genesis block but all other positions will be available. I don't want wrote deadline of tests but i hope to these tests will be closed this year. This it also depends the teams who help the execute and evaluate of tests. I hope the first teams will be available shortly. If the STaTiC registration tests successed then i will add this code to the system immediatly. And all level of registrations will be available after.