So you are saying the problem is in their slow deployment process, not shortage of power capacity?
BOTH, because delay is with UL certification and with material arrival due to hurricane etc.
REGARDING DELAYSUnfortunately there have been many factors beyond Giga Watts control in the past few months. These have included numerous government inspections, delays in the delivery of power equipment and transformers due to recent hurricanes, month long connection delays to electricity pods 3/4/5 by the Grant County PUD (Power Utility Department), delayed delivery of our Alpha miners, building inspectors insisting on UL certified Power Supply Units (PSU) something that the manufacturer provided PSUs didnt have, and flow on supply chain problems as a result.
