Post
Topic
Board Mining
Re: My 700 TH/s Bitcoin Farm, LEH, J&K,INDIA
by
mw1
on 11/12/2017, 15:21:00 UTC
PICS COMING SOON, once ventilation work is done !


CURRENT : PROBLEMS

1> MOISTURE + MIST IN ENVIRONMENT
2> Wirings Are Not Good, Was Using Aluminium, switch to copper soon



For wires, whether you stick with aluminum or go with copper, make sure they're sized properly. Most electricians I've seen in India will undersize the wire and this causes the wire to melt in the wall. Same reason it's always "when the wire melts" not "IF".

I always recommend a wire that's one gauge (or thickness level so .5-1.0mm in your case) thicker than needed for the breaker size. This way if there's an issue the breaker will trip and wire won't overheat/melt.

Moisture, there's a solution there too. Sent you a PM.