warning: job finished, miner is idle <-----anyone know how to fix this? Is it a problem with the pool or something on my end?
me too. im getting "work queue empty miner is idle" a lot, even with short disconnects.
using phoenix 1.5 with phatk win7 32bit
http://s7.directupload.net/images/110624/temp/tbynf4wp.jpg