Post
Topic
Board Hardware
Re: BFL board project COINTAMINATION - EU+USA facility - need samples for one board
by
JerimiahJohnson
on 20/09/2013, 11:44:22 UTC
Is this first time in history of BFL that it delivered something on time?   Cheesy

EDIT: If anyone needs boards in less then 10 days outside US contact me ASAP... If in the US contact JJ

Hi Lucko

I was expecting chip delivery comments on "BFL Jody blog".
I thought they would have made an announcement seeing as they are on time and on price with these chips.

All we need now is for form to have a "good day" today with his boards and chips, then COINTAMINATION is live and public.

Thanks in advance

Just to note we also have boards being assembled in our US assembly facility, which will ship on 09/24

Here we have state of the art pick and place machine and industrial level equipment and will not run into the problem lucko described above

Form is very talented engineer but doing this by hand is extremely difficult even for the most talented of hands.

Weather form succeeds or not (I hope he does!) we will have professionally assembled production boards hashing away next week, either way.

-JJ