Hello,
I have 8 Avalon Asic miner.
4x Batch 3
4x Batch 2
I have some questions.
Is it possible to move an module from Batch 3 to Batch 2? As I read, only
the case design is different between the batches?
Can I get more performance if I build
3x Batch 3 (4 Modules)
3x Batch 2 (4 Modules)
And which power supply do I need for this configuration?
Is 1000 Watt enough?