Post
Topic
Board Mining (Altcoins)
Re: Cairnsmore1 - Quad XC6SLX150 Board
by
tigerbit
on 26/09/2013, 12:58:28 UTC
Well, unless my calculations are very much mistaken next difficulty update will be so long and thanks for all the fish time for my CM1s  Cry

With one more circa. 30% increase in difficulty I'll only just be covering my power costs @ £0.09926 per kWh including VAT @ 5%.

Well, the temperature will be dropping soon here in the UK - perhaps I'll redeploy them into a less friendly environment as a frost protection heater for the winter Grin