With the power connector on the bottom of the K16 I have to lay the miners I have running on their side. I'm thinking about building a custom shelf for them so I can route power out the bottom. How is everyone else setting up their miners? How are the hosted miners physically configured? And is anyone successfully stacking their miners? Any pictures?
Thanks,
-Jay