I got briefly excited when the fans arrived.

Where are mah modules!!1
Side note: I can't tell a difference between the I30 and the A30. The fan is on there really sturdy.
Guys, due to the fact we underestimated the demand and oversold, we had to wait for the rest to be produced at the factory. Currently as you can see, they are being packed with all the auxiliary parts, then labelled.
As they sold out and were paid for in seconds, and there isn't any logical order of sale, we sat down and had a chat as how to best approach this, and to be fair to everybody that ordered within those 7 minutes, they are all being shipped at the same time on Monday.



Isn't that dangerous? Throwing electronic boards on top of one with anti-static system around at all? These are $1000 cards here. I thought they would take care of them a little better then that. Also, have they all been tested before being sent out? The last thing KNC needs is more RMA work on for modules they just sent out.