With two more miners being delivered tomorrow I thought I'd go ahead and make a box to help control both the heat and the sound.
I have a lid already made with hinges and a locking latch. Still yet to finish are the grates inside and holes to be drilled for power and network. I also will be putting together duct work to exhaust the heat outside. I have two inline duct fans being delivered tomorrow to push/pull air through the box.
https://i.imgur.com/9KIRec1.jpg