Update:

Hosting:

We will be processing payments for hosting for the first period shortly, and after each subsequent difficulty change thereafter. The first payment will be for the difficulty periods beginning November 5th and November 17th. While the cluster was not at 100% until recently due to setup and testing, payouts for these periods will be based on 100% uptime with a hashrate of 4.5gh/s. We will also be waiving the hosting and electrical fees for these periods. The power consumption per unit is 75 watts, which includes the units themselves and the infrastructure necessary to house and cool them. The electricity cost for each period will be calculated using the Coinbase USD/BTC exchange rate at the end of each period.

Just to verify, does this mean we will be paid for every time from Nov 5 up to now at a steady 4.5gh/s, and then paid from now on at the actual hash rate?