Love to see some pics of that. Sounds impressive. How did you overcome the power issues of getting it from the street to the site? Thats a huge amount of amperage being pulled down through your box.
for example i was having 30*5970, 20*7970 and 20*7950...
P.S. If my math and my own payouts from the pool are correct. from Decmeber to july, the most you could get from a 24hr period per 400mhs gpu was 0.012 and that became less than 0.01 around march. Thats bassed on a single worker and payout records for that work during that time.
Edit: So at 0.012btc a day per gpu, and no difficulty change, you need to be running 34+ gpus non stop until the pool closed from december for 85btc.