Weekly Update 12/18/13
Crypto-Trade:
I have all of the legal issues worked out, and I am programming them into the verification site.
VMC:
We are working with eASIC and our engineers to get our chip and boards in full production.
We have stock piled all the hardware to build the miners and we are per-assembling the miners.
What a way to once again say nothing. I assume you have been "working with eASIC and our engineers to get our chip and boards in full production" since June. How about some actual updates. Has there been a pilot production run, if so, do you already have those chips, are they working? If not, whats the timeline?
I would argue that he does say something of importance here.
Legal issues worked out = important.
"to get our chip and boards in full production" I interpet as chip samples & low-volume chip production (see below) is done, only last step left.
But maybe I am wrong.
What are the current plans for chip development?ActiveMining is developing a 28nm Bitcoin mining chip using
eASIC.
- Chip samples delivered in 9 weeks;
- Low-volume chip production starting in 12 weeks, using an e-beam process;
- Normal volume chip production starting in 16-18 weeks.