A generator with 100MW nameplate capacity will generate a theoretical maximum of 100MWh per hour, or 876GWh per year. Multiplied by the capacity, thats total energy production. I believe the whitepaper assumes around a 63% capacity, which is initially raised with us earlier this month & the team are looking into how we arrived at this number to clarify that.