It seems that BITTECH will take over Envion's success with almost the same concept and more promising
Related bounty 5% or $ 5,000,000 seems this is too much even one of the largest bounty allocations ever in this forum, have you considered this?
Maybe some people will need this information
Presale - Soft-cap $1,500,000 and Hard-cap $5,000,000
Main ICO - Hard cap $ 100,000,000
ICO price $1 per token
unsold tokens are burned.
Thanks for the kind words. The amount allocated for the Bounty campaign is calculated for the entire duration of the ICO, by market standards the amount isnt so large.
Good. Warehouses for farms you will build. This is not a problem and is not worth much. And how are things with the protection of objects? And also, where will you build electricity and how much will it cost? Also, how will the cooling be carried out?
Thanks for the questions. On the example of the data center under construction in Russia. 1. Security. For security, an agreement with a local security company will be concluded, as well as a video surveillance system inside and outside the building. Indoors installed fire-fighting system. 2. Electrification. When choosing the location of the data center, the decisive role is played by the availability of the necessary free capacities. In the Irkutsk region, Russia, there is a large reserve of power, more than 200MW. At the same time, the cost per kW does not exceed $0.07. 3. Cooling. Together with the engineers of the company IGC, was developed the ventilation system of each data center, the system allows maintaining a comfortable environment with a sufficiently low noise level. Important also are the climatic features of regions.