Found the setting included in the pool configuration...
Can this be added to the Pool Group configuration possibly?
[Maybe this is in the software already, but I did not see it.
I am looking for a scaling factor for the monthly revenue/profits.
In my case, there are 4 hours M-F that I do not mine. So I would like the profit/revenue calculation for the month to allow for a scaling factor from 0 through 1 so that I can adjust for the missing hours per month (or for any other reason, does not really matter why actually).
So if I assume a month is 28 days, this equals 24*7*4=672 hours. If I know I will lose 20 hours a week mining, that would be 80 hours not mined out of the 672. I would then want to put in (672-80)/672 as my scaling factor for the calculation for the monthly revenue/profit figure.
Where I live, my power rates are one low rate for weekends, and 3 different rates for M-F. So what I do is to calculate the average rate for the times I mine and put that into the cost of a KW/h. Another option would maybe have a field that asks how many hours are mined each day which may result in a more accurate figure since the number of days in a month varies which would calculate the total hours per month and I would still have to use my own calculated power average. Just a thought.
Thanks for an Awesome piece of software, top notch!]