When you say 'wired' does that mean that a standard 3-phase 600 amp panel install should be a relatively 'plug and play'? Where do you deliver from? PM.
All the panels are pre-installed, the racks are setup, the network switches, the Power distribution units etc are setup. You would just need to purchase the miner and the PSU and plug it in. We deliver from Idaho, USA.