At the end of 2016 we organized a mining farm for 350 kW. There we've discovered the problem of dependence on central networks and changes in electricity prices. Future Energy allows us to fix that issue and gives us free reliable energy source.
In parallel with the expansion of the existing business, we decided to develop a completely new, nonstandard approach for obtaining energy and optimising the mobility of mining farms. The projects installed and developed technology for power supply operates from 500 kW with an operating component of 0c/kW.
Find more at
http://icoenergy.org