With the funds collected during the ICO, we are going to build a power plant obtaining 1.5 MW of electricity. That plant will free the owners of the solid waste landfill site from paying environmental charges and taxes, while our company becomes the consumer of energy that will provide mobile mining modules. At such a facility, we will be able to place 5 mining modules with a capacity of 300kW each based on ASIC Antminer S9 which is approximately 1000 Antminers.
You can find more information in our White Paper:
https://icoenergy.org/docs/WP_eng.pdf