this. all of this.
finflof you haven't replied to my pm about why you think my my earlier posts were so out of order.
I find it concerning that you accept every word of this Mr Teal without question. His figures have not even been researched or cross-checked with the official figures as stated by Ken. Yet you agree with his every word? Every one?
again you show your maturity by "cleverly" changing someone's name to something that tries to make it seem like they are less intelligent than you. keep doing it if you think it makes you look smarter.
I did reply to you. some of us go to lunch and do actual work and dont keep pressing F5 like their lives depend on it. here is the reply so everyone can see it since he referenced it:
EDIT - and yes I accept MrTeal's explanation and breakdown. much more so than I accept anything Ken says. Just because you (and some others) hope/need/want ActM to succeed and meet all projections by Ken doesnt make it true. And kleeck says it's feasible. I agree it is possible should all the planets align, but highly unlikely, especially given the way things have happened with this company so far.
finlof,
I'm interested in what you think I did wrong on the last page? This guy said the 1-2 PH data centre could not be created from scratch (even by Q3) because of the power infrastructure needed to be built. I provided a link that shows you can hire a facility with all the power required for the machines. He then ignored this evidence and went on to say we can't get the electricity cheap enough.
So what is wrong in your opinion with me supplying evidence that proves this guy is completely wrong about the 1-2PH plan and the power infrastructure?
you provided a link that shows a 11700 sqft spot for lease. the entire building has 120 parking spaces, has 9 megawatt capacity, etc etc etc. this is for only 11700 sqft of a 400000 sqft building. so you obviously wouldnt have access to that amount of power, and whatever power you did have access to you would still have to build out the infrastructure of the rented space, including wiring it within the terms of the law (licensed electrician, etc). that lease price would certainly not include electricity/utilities, nor the cost for any renovations need to house 1 - 2 PH of mining equipment (quite pricy, time consuming and difficult, especially using 1.9gh/s chips). see his latest post in the forum for all the shit that would need to happen once chips were received. it really is next to impossible.