... just finished the second stage of out build out in Clifton NJ.
27 units doing btc
420th btc
13 units doing ltc
5.3gh ltc maybe more like 6.3gh as I think I have two units pointed wrong.
The 4 M10's are beasts right about 131th and 9200 watts
Quite impressive !
I will sleep better knowing they are not Bitmain's gear, that's for sure
