..the farm and the central CPS will be built in the Canary Islands, we are treating for a plot of 380,000 square meters (the negotiation is underway, subject to authorization for construction). On the island they have problems with drinking water, so with the waste heat, we will make desalination.
Which Canary Island are you referring to?
I notice that a similar type of "green" project
CryptoSolarTech, failed to get planning permission for their scheme to be built in mainland Spain, and is
now refunding their ICO proceeds.When do you hope construction to be authorized by, and do you have a Plan B location should it be refused?