Right now we're packing up the shop. The last units built in our current location are currently on the tester and will be dispatched to a reseller next week. The first truckload of tools and materials rolls out in the morning.
Good news is, stuff for the next batch is already on order. Most of it's already here. Production will start in the new shop not long after Thanksgiving. I recently redesigned the PCB so the new batch units will be quicker to assemble and quicker to test and verify, so that's good for you guys.