Post
Topic
Board Marketplace
Re: SkepsiDyne Integrated Node - The Bitcoin Mining Company
by
mrb
on 17/09/2011, 20:21:02 UTC
My 4x5830 rig draws 650 watts and outputs 1112 mhps which generates .64 btc and draws 15.6 kwh.
.15 for 9 hours and .08 for 15 hours is about .11 per kwh average per day.
Cost to generate btc is $2.59 per coin.

Your setup computes 1.71 Mhash/Joule. Although there is a lot of invalid data in https://en.bitcoin.it/wiki/Mining_hardware_comparison your claim is inconsistent with the wiki which puts the value anywhere between 1.3 and 1.6 Mhash/Joule.

How did you measure 650W? Do you under/overclock the GPU or memory? Etc.