Suffering a bit power outage at the moment.
3 hours and counting. UPS can't cope with this.
Will add time to current leases or refund as required when power returns.
EDIT:
power returned at 0805, but the dns scripts didn't run correctly.
Miner was running, but leaserig system couldn't connect for 9 hours so have added 18 hour to the current leases.