150kw is getting into 3-phase territory but still very practical for single phase service. It comes down to cost of the panel (size and amount of copper in it) and if the power company needs to supply you with a different service transformer to feed the building. As Mikey said, go with what is cheaper.
Is drawing 150kw on a single phase an issue for the TDU since it is extremely unbalanced on the transmission lines, right?