Datacenter delays are causing these problems. Typically, real estate of this large-scale nature is prepared months if not a year in advance and we are doing this in weeks. Everything will be operational within the coming week, but until then we have to do our best with our current resources. I will post the miners on ebay for 10 days and cancel if the 7 day motion does not pass.

If the motion to sell the units does not pass, we will be in a top-class tier-3 datacenter piggybacking on a larger operation, getting the cheapest power in the nation.

Best,
Garrett
Garrett delivers: 1/3 of mining capacity have been "operational" for at least 1 hour this week!
Garrett does not deliver: a motion & the miners on ebay.

The rest of the week we were mining at 15% of the promised hash rate.. again.
In february we should have mined about 180 btc, instead we got 6 btc. (9.3 deposit was not by mining afaik).
Uptil today in march we should have mined about 60 btc, instead we got 6.5 btc.