I've got an opportunity to acquire warehouse space. It has a 600a 3 phase service. I currently am running 3 ASIC at my house and I'm literally out of capacity. My question(s) are:
- Is there something available as far as a "getting started" guide to building out a mine. I've been researching hot/cold rooms, exhaust/intake fans, etc and feel comfortable with that.
- Surge protection? Is that even a thing when it comes to 220v or stepping down from 3 phase? My father is a licensed master electrician and I've got basic knowledge but I haven't seen much as far as if surge protection is needed on ASIC machines.