[WTS] 300kW Mining Facility
by
elokk
on 01/08/2022, 20:19:43 UTC
Located in Southeast Missouri

300kVa Transformer
1200 amp 3-phase 208v (strictly for miners)
(20) 60amp circuits
(5) 10,000 cfm exhuaust fans
(4) 60x60 air intake louvers with washable Merv4 & Merv 11 filters
(Cool 30x30 air intake louvers with washable Merv6 & merv 11 filters

(20) 48 amp APC pdu's
will include enough ethernet and power cables to run 100 s19s (s19s not included)

Building also has a separate 400 amp single phase electric service which runs exhaust fans lighting, etc,  2 bathrooms, overhead led lighting water softener, drinking fountain, etc

SERIOUS INQUIRES ONLY< PLEASE DM

$300k