Are you talking with chances??
Aren't we all? Unless you have a magic crystal ball then you don't know what the future will hold.
Since you won't take the bet let's revert to name calling. If SP-Tech delivers on time and on spec i will call you as i wish(maybe troll). If SP-Tech won't deliver on time and spec feel free to call me as you wish. Deal?
Sorry I didn't know the bet was directed towards me. I'd be happy to take the bet but not for 1btc. That is too much for me to gamble especially because I think that out of all the asic manufacturers, SP has the best chance of delivering on time and on spec. But I still find it unlikely.
So if you want to bet here would be my terms:
- 0.1btc donated to seansoutpost (loser pays)
- SP must deliver their
entire August batch no later than 1 week after August.
- SP30 specs must reach a minimum of 5th/machine and 0.4w/gh (efficiency must be reached above 5th)
Deal?
LOL? So wait. First you claim that they won't deliver in time and in spec and now you chicken out? Let's make it 0.5 BTC+free name calling. 0.4w/gh? How did you came up with that? It's not what they announced and it's not in their specs. If you agree on 0.5w/GH then we can do it, but you are requesting a better efficiency than advertised. Minimum 5TH and 0.5w/gh and we have a deal.
Indeed, we're at 0.35 W/GHs at the
ASIC level and below 0.5 W/Ghs at the
system level (Working on our DC2DC design so we'll be below 0.45 W/Ghs at the system level)
I've mistaken in reading jimmothy post. I've assume he is referring to below 0.4 W/GHs in the ASIC level.
We got final post layout engine results from GUC.
The ASIC is at 0.35 W/GHs, which means that the system is at 0.43 W/GHs
Under 2700 Watt (total from the 2 PSUs), the system will be ~6.3 THs
Our commitment is still to 5.4 THs +- 10% as published in the web site.
@Spondoolies-Tech
I just realized something serious here.
Everyone is posting about 208V power setups.
Here in Japan, my power is currently 100V I believe on 50hz power.
Is this going to be an issue with the SP10 to get FULL output capability?
With the SP30 requirements I think I will need to get a 200V 60amp breaker
installed pretty soon??
I currently have only 100V 50hz 60amp breaker.