Do you have a private mine with your own equipment, built for your mine for you and your company and its Venture Capital investors?
We currently don't have a farm. Our data center is solely for hosting our customers units.
We don't have plan to have a farm during 2014.
We want to concentrate on building and selling the best mining machines, not operate farms.
Clear enough ?
Is this still the case? Will there be any disclosure should there be any future collaboration with Allied Control? Through what means will Spondoolies utilize to show their transparency to the community if you should start hosting customer units on a larger scale? To think that Spondoolies have not and will not consider immersion cooling is ludicrous (feel free to correct me if I'm wrong).
I do not have any problem with your products, which have been reviewed with much praise. Instead, I am more concerned that there will be another Bitfury-like entity, who have the means to control the total network hash rate.
Gen3 will probably be deployed within DC and managed by spondoolies, as by then individual mining could (should) be no longer profitable.
Customers would probably have the possibility in buying hosted GH by then.
However, this is still FAR in the future when taking into account "bitcoin time" and only one of many possibilities.
For this purpose and for possible large scale investors in Gen2 chips / devices the research at Allied Control will provide some experience with immersion cooling.