From the prospectus:
DataTank Mining will deploy up to 10 container mining systems (12MW / 24 PH / 60 Tanks) within 3-6 months of successful completion of the IPO (ie. Q3 and Q4 of 2014). Two locations with renewable electricity at around $0.02 per kWh are available. One location is within the USA, a second location is available with similar electricity cost, in a free trade zone with favorable climate and no import or export restrictions.