When will the pickaxe be released approximately?
Why are you not taking preorders?
Hold your horses there, first you criticize them for taking preorders, now you want them?
There is obviously no need for preorders, as they are still in the design phase.
Furthermore, nobody knows how the mining equipment market will look like at the end of this year.
No I'm just wondering why the sp30 is the only generation that needs to be funded by preorders.
I also call BS on AM current generation at 0.6W/GH at the wall.
You would need special low voltage transistors and severe underclocking to achieve that on this chip design.
Please provide a quote or source for that assumption though, if it indeed was said by AC.
I noticed you expect each 1.2mw container to house 2PH. Does this mean that asics have been tested at 0.6w/gh?
ASICs have been tested at various efficiencies including ~0.6W/G. Better cooling also changes power consumption (some chips 33% less at 65C vs. 85C).