quote from the 14th
Some thoughts on the maths of the 10% discount voucher:-
If a batch 1 order (pair of miners) was 1.50 BTc then the voucher will be worth 0.15 BTc
So a future order for Batch 4? will have a starting price of (pair of miners) 1.35 BTc
Deduct the market reduction Bitmain have been applying of at least(pair of miners) 0.05 BTc = 1.30 BTc maximum (copied from the Batch 3 price)
Then you arrive at 1.30 Btc less the voucher of 0.15 BTc
This puts a Batch4? (pair of miners) at a net cost of 1.15 BTc
By the time the backlog of orders are cleared, then another market reduction will be needed. (another 0.05 BTc)
By the 20th of this month we should expect to pay no more than 1.10 BTc for a pair of Batch4? miners.