if there is a test phase...
If there is a test phase...
Ok i will let you know when there will be the test phase
Nice to see a bit of support from you guys

And another update .
0NE Engine status :
We bought all parts for build a pc mining rig with starting config 2 r9 280x gpus + 1kw atx 80 gold
(budget was ~ 0.8 BTC = 0.4 from investors + 0.4 from us )
2 slot and enough power to feed other 2 gpus as possible future upgrade
- Looking for a macro/software that can switch different solo mining config at a predetermined time
need a few days more to finish receiving all the missing parts and do the assembly
summarizing , 0NE Engine project started , is still a small rig but it is just the beginning